It was a long day, but the team had a great trip to the nation’s capital in early April, where they checked in on our latest CLT project. The cross-laminated timber (CLT) panels have arrived and installation has started at a warehouse and retail outlet in the Ottawa area. This is a hybrid steel-wood structure with steel framing for the roof and CLT for the 8.5 m tall walls.
Stay tuned for more details.